start of swimming pool construction in Estepona
Swimming Pools
Swimming pool construction and renovation, Costa del Sol
  • Posted By SpecialisedBuilder
  • on January 22,2018

Swimming pool construction and renovation, Costa del Sol

We have vast experience in the renovation and construction of swimming pools.

For new swimming pool constructions, the most time consuming thing is the paperwork. The actual construction of a concrete swimming pool takes us about 2 weeks.

The first step in the construction of the swimming pool is to retain an architect. The architect will draw up plans and submit these for approval. Once the plans have been stamped, we can move on to applying for the building license. This can take any where from a few weeks to 12 months, depending on the area.

When the paperwork is completed and approved we can break ground. We favour sprayed gunite concrete for small domestic pools. The pool form is excavated to the required dimensions, and brick shuttering is built. Once this is in place, steel reinforcing is put into place, along with the pipes and light buckets.

The concrete is then sprayed at the wall under high pressure to a depth of around 200mm

After this we cast the white marmolina swimming pool surround, render the walls and tile with glass mosaic gresite.

start of swimming pool construction in Estepona
1
start of swimming pool construction
0
start of swimming pool construction
0

Roof in need of replacement
Exterior , Interior
Complete Villa Renovation in Coin, nr Marbella, Costa del Sol
  • Posted By SpecialisedBuilder
  • on January 22,2018

Complete Villa Renovation in Coin, nr Marbella, Costa del Sol

The joy of purchasing a home on the Costa del Sol, is that you are able to put your stamp on it and make it truly personal. Renovating or reforming an existing finca or villa is a way of doing just that. It allows yo to get the finish that you want from your swimming pool area, terrace and interior living spaces.

Planning the schedule of works is the first step. We will not only discuss your immediate plans, but also your future plans to ensure that no unnecessary works are done and that no extra cost is incurred in the long term.

Part of our service can include the application for the correct licenses from the town hall (ayuntamiento), whether it be small works (obra menor) or major project (obra mayor). In general, for an obra mayor an architects project is required.

Our team of specialists includes architects, plumbers, certified electricians, tilers, painters.. we have it covered.

In this example, the project was of a huge scale, taking just under 6 months to complete. The entire home was stripped out down to bare walls and floors and then started again. This included all the electrics and plumbing. The villa was completely rewired and supplied with a new Boletin (safety certificate required by the energy company). Some of the plumbing was not good as new pipes had been added, others blocked off etc.. so leaks would probably be a problem in the future.

Each room was completely stripped out, rendered and plastered, then new high quality tiled floors put down. New windows and doors were installed.

Here are some progress photos, in later posts, we will post finished pictures and detailed descriptions of the building work involved.

Progress with interior renovation of villa
0
Roof in need of replacement
0
Outdoor BBQ and kitchen demolished
0
Interior villa renovation
0
Steel structure over outdoor kitchen
0
Bespoke uPVC windows
0
New wiring being installed
0
Rewiring of Villa Finca
0
Coin finca renovation with new windows
0

In need of reform
Exterior , Interior , Swimming Pools
Villa renovation Fuengirola
  • Posted By SpecialisedBuilder
  • on January 19,2018

Villa renovation Fuengirola

This is the first stages of a complete villa renovation in Fuengirola. The villa will undergo a complete reform, but the work will be carried out in stages to ease the financial burden of the project and to give the clients relief from the building works (as the clients have moved into the villa now it is habitable).

The first part of the renovation was carried out last year, renovating the interior, kitchen, bathroom, and living areas. This was all plastered and painted and is a comfortable living space.

The second part of the renovation was what can be seen here. The pool was leaking, so has been renovated using a Renolit AlkorPlan 3000 reinforced pool membrane which completely seals the structure, with a 10 year warranty. In addition some minor leaks were repaired in the pump room.

We have carried out some exterior painting with fine detail on the balustrade and replaced some doors and windows.

In the pictures you can see that work has started on the underbuild, The basement area will be made into a self contained apartment.

We can be flexible and work to our clients needs and budget.

 


Exterior , Interior
Electrician Costa del Sol
  • Posted By SpecialisedBuilder
  • on January 19,2018

Electrician Costa del Sol

We have qualified electricians on hand that can rewire villas and apartments and provide the all important “boletin”, to be able to get electrical connection.

If major renovation works are done on an older property, it makes little sense to leave old cable under new finishes.

As part of the rewiring, plug sockets, lights and light switches can all be put in more convenient places. Cables and conduits can be run for existing installations and also allow for future upgrades such as air conditioning units, pool heaters, exterior lighting, automated gates. Part of our approach to building works is to think about future requirements as well, this often saves money in the long run.


Pool and building works, Mijas
Exterior , Swimming Pools
Pool transformation, pool made bigger, pool tiled and leaks repaired
  • Posted By SpecialisedBuilder
  • on January 19,2018

Pool transformation, pool made bigger, pool tiled and leaks repaired

We completely renovated this old leaking swimming pool. The first thing we did was diagnose the source of the leaks. We diagnosed leaks in 2 runs of plumbing, in both the skimmer pipes and the return pipe.

The bridge, which didn’t really have a purpose was removed so we could make the pool wider, as at this point it was very narrow. The pool looked even narrower once the bridge was removed. It is not normally recommended to alter the structure of a pool, but in this case it was feasible, as we were working on the shallow end of the pool, where there was less stresses involved.

Steps were built into the shallow end of the pool that also serve as a seating area, perfect for enjoying the panoramic views from this villa in Mijas.

Once the pool had been made wider and the steps had been built in, we cast a new “marmolina” pool surround. The marmolina is white concrete that is floated to give a uniform smooth surface, but still is non slip. To make the marmolina we have to build shuttering around the pool and pour the mix into it. After the shuttering comes off, we polish the edges and put expansion cuts in it.

After this the swimming pool can be tiled, grouted and cleaned ready for filling.

The plumbing is all new, for a trouble free future. When planning works to the pool, it is important to consider the future.

After all this work, the transformation was complete with a tropical turquoise tile and a beautiful new surround. This was quite an amazing transformation, taking our superb team about 2 weeks. For perspective, the pool measures 15m x 5m

Pool and building works, Mijas

Pool building and renovation works, Mijas

Pool with new terrace

Complete building service, Costa del Sol

Leaking pool in need of reform

Leaking swimming pool in need of reform, Mijas

Making pool wider

Making the swimming pool wider, Mijas

Building pool walls

Swimming pool construction


Recent Posts
  • Swimming Pool Tiling and Renovation, San Roque
  • Swimming pool refurb and building of terrace area
  • Concrete block wall construction, for retaining wall or extension
  • Stainless Steel Balustrade post and cable at Villa Renovation
  • Swimming Pool Tiling, Mijas, Costa del Sol, Spain
Recent Comments
  • Cammy Kyle on Construction of Stables, Coin, Malaga
  • A WordPress Commenter on Hello world!
Archives
  • July 2020
  • May 2020
  • April 2020
  • January 2020
  • November 2019
  • March 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • September 2017
  • August 2017
Categories
  • Exterior
  • Interior
  • Landscaping
  • Swimming Pools
  • Uncategorized
Meta
  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
SPECIALISED BUILD

Nearly 20 years of experience offering a complete building service on the Costa del Sol and Inland. Construction work and renovation of interiors, exteriors, landscaping, and swimming pools to build the house you dream of in a timely manner and on budget.

CONTACT US

Phone call – WhatsApp
+34 650 200 040
+ 34 680 501 508

Email: info@specialisedbuild.com

CONNECT

Copyright Specialised Build 2017-2018. All Rights Reserved
Tel: +34 680 501 508 | +34 650 200 040
www.specialisedpoolrepairs.com | www.specialisedbuild.com | www.piscinaliner.com